Belt Maintenance and Replacement
2017 1 18 7. Tighten the six motor mount bolts. 8. Replace the belt guards. Properly installed belt guard REPLACING BELTS V TWIN 1. Lockout power to the crusher. 2. Remove the belt guards beneath the crusher and set aside. 3. Loosen the six motor mount bolts that hold the motor mount to the frame. 3a. V Twin crushers use a 2 stage pump with a